The field work is done, the excavation trench filled up and the cars clean again. But this does not mean that nothing more has to be done. Besides the excavation and the survey operations, the lab had to be run as well.

In the previous five weeks we sieved, washed and sorted over 450 buckets of sediments. All the artefacts had to be cleaned, labelled and sorted. We worked on refittings and plotted the progress of the excavation.

Cristina and Nico washing sediments

Cristina and Nico washing sediments

Kristin at the refitting tableand Nico washing sediments

Kristin at the refitting table

Even now with most of the team already gone there is still a lot of work left and our analysis and documentation continues on.

Adrian and Radu back at Bucharest and still at work.

Adrian and Radu back at Bucharest and still at work.

Advertisements